Project information

Due to the rising humidity, the columns on the ground floor of the building were oxidized. A fact that caused the separation of the concrete coating. The steps that were taken for the restoration of the damages were the following:

  • Dismantling of all the weathered parts of concrete and full coverage of the corroded armaments.
  • Cleaning of all the surfaces that have been oxidized.
  • Coating of the armaments with corrosion inhibitor.
  • Coating with resinous reparative mortar.
  • Application of finely milled finishing mortar for protection, smoothing and finishing.
  • Application of gas-phase corrosion inhibitor on the columns wherever it was deemed necessary.